Photos preparing the site last week

pumping4 Megalonyx Matters 20

The week of July 6 was predicted to be sunny and apparently an ideal time for a two day excavation to recover additional remains of the baby and toddler discovered at the end of the May dig. As in the past, Evans Rental hauled the rented crawler to the site a day in advance.  Will Mott arrived mid-morning with a large gas-powered pump which rapidly pumped the accumulated water from inside the levee.  He estimated the capacity at about 100 gallons/minute. After the pit was ‘dry,’ Will relocated the levee protecting the previous dig north about 12 feet and then removed the muck resulting from two floods from off the floor of the  excavation area. This was accomplished by 7:00 PM. Unfortunately, overnight thunderstorms produced heavy rains which lasted into the following day. While the creek did not overtop the levee, the rain was sufficient to flood the excavation and render the area inaccessible for the pump, crawler and people.  More storms were predicted later in the day. The volunteers vowed to return as soon as possible after the area dried. Participants were William Mott, Lee McNair, Bill Wiechman, Aaron Last, David Brenzel and Holmes Semken.

Holmes Semken and David Brenzel, July 9, 2009. 

clearing rescuing_fish pumping2 pumping1  scoopaway pumping3 aaron_bobcat